What is nuclear energy? At the end of 2019, seven nuclear reactors were under construction in India, with a combined capacity of 5.4 GW. What are the advantages and disadvantages of using nuclear energy in India? What is the NPT and how does this impact India which is not a member of the NPT?

Syllabus: Space, defence and nuclear technology · Nuclear technology and policy

Model answer · free

Nuclear fissionThree-stage programmeNPTNSG waiver

Nuclear energy is the energy released when the nucleus of a heavy atom such as uranium-235 splits (fission) or when light nuclei join (fusion). In a reactor a controlled chain reaction heats water into steam that drives a turbine. India runs 24 reactors with 8,780 MW (about 3.1% of electricity in 2024-25) and aims at 100 GW by 2047.

1. Then and now: reactors under construction

The units being built at the end of 2019 included the first 700 MWe PHWRs at Kakrapar and Rawatbhata, the PFBR and Kudankulam 3–4; most are now complete or nearly so. Newer units (Kudankulam 5–6, Gorakhpur 1–2, Kaiga 5–6) are under construction, and NPCIL counted 17 reactors (about 13 GW) under implementation in September 2026.

ReactorType and sizeStatus (2026)
Kakrapar 3 and 4, GujaratPHWR, 2 × 700 MWeOperating (2023, 2024): first indigenous 700 MWe units
Rawatbhata 7 and 8, RajasthanPHWR, 2 × 700 MWeRAPP-7 on the grid (2025); RAPP-8 fuel loading (September 2026)
PFBR, Kalpakkam, Tamil NaduFast breeder, 500 MWeFirst criticality on 6 April 2026
Kudankulam 3 and 4, Tamil NaduRussian VVER, 2 × 1,000 MWeDue in 2027 and 2028
Main units under construction in 2019: status in 2026

2. Advantages for India

  • Clean, firm power: near-zero carbon emissions and round-the-clock supply that balances solar and wind.
  • Energy security: India's large thorium reserves (monazite sands of Kerala, Odisha, Tamil Nadu and AP) can be tapped through Homi Bhabha's three-stage programme; the PFBR opens stage II.
  • Small footprint: very high energy density needs little land per unit of power.
  • New momentum: the SHANTI Act, 2025 allows private Indian companies into nuclear power, and the Nuclear Energy Mission (₹20,000 crore) aims at five indigenous small modular reactors by 2033.

3. Disadvantages

  • Cost and delay: high capital cost and long gestation; the PFBR, begun in 2004, reached criticality only in 2026.
  • Fuel dependence: domestic uranium is limited and low-grade, so imports are needed.
  • Safety and waste: the risk of accidents (Fukushima, 2011) and long-lived high-level waste that must be vitrified and stored for centuries.
  • Social and legal hurdles: land acquisition, local protests (Kudankulam, Jaitapur) and earlier liability concerns that kept foreign vendors away.

4. The NPT and its impact on India

  • What it is: the Nuclear Non-Proliferation Treaty (1968; in force 1970) recognises only the five states that tested before 1 January 1967 as nuclear-weapon states; all others must forgo weapons and accept IAEA safeguards. India, Pakistan and Israel never joined.
  • India's stand: the treaty is discriminatory, freezing a nuclear "haves and have-nots" order with no disarmament timetable.
  • Costs: after Pokhran-I (1974) the Nuclear Suppliers Group denied technology and fuel, sanctions followed Pokhran-II (1998), and uranium shortages kept reactors below capacity.
  • Gains: isolation forced self-reliance in PHWRs, fast breeders and enrichment. The 2008 NSG waiver and the Indo-US 123 Agreement then opened uranium imports, and India joined the MTCR, Wassenaar Arrangement and Australia Group.
  • Continuing limits: NSG membership is blocked, chiefly by China, which cites India's non-membership of the NPT.
  1. 1968 NPT signed; India stays out
  2. 1974 Pokhran-I; it leads to the NSG (1975)
  3. 1998 Pokhran-II; testing moratorium
  4. 2008 IAEA safeguards, NSG waiver, Indo-US 123 Agreement
  5. 2016–18 MTCR, Wassenaar, Australia Group
  6. 2025 SHANTI Act opens nuclear power to private firms
India and the non-proliferation order

AP angle: NPCIL plans six 1,208 MW reactors at Kovvada (Srikakulam) with US technology, and UCIL mines uranium at Tummalapalle (YSR Kadapa).

Nuclear power is no silver bullet, but as a low-carbon base load it complements renewables. Standardised fleets, an independent regulator and fuel security can make it a pillar of energy security.

The other choice in Q4

Answer either one in the exam.

  1. Q4(b)What is "Clean Energy"? List the sources of clean energy and explain how they work. Which of these sources can be used or are already widely used in India?

    10 marks · Energy: conventional and renewable · Renewable energy

Write better answers: the Answer Writing Tool Kit

Every model answer on these pages is free to read. The Tool Kit adds four PDF books for Mains Papers I–IV: every previous question sorted by syllabus, with practice questions. It is in the ₹149 All-in-One Pass, with every previous paper of every exam on the site, practice quizzes, timed tests, mock test series and study books.

₹149 · valid for 12 months from the day you pay, on every exam · pay by UPI, card or net banking

Get it for ₹149