Hydrology

  1. Manager 2015 Paper 2 (Civil) · Q50 · Water Resources & Irrigation · Hydrology

    In a catchment there are six rain gauge stations with average depth of rainfall of 92.8cm and standard deviation of the rainfall is recorded in these rain gauge stations is 30.7cm. For a 10% degree of error in the measurement of mean rainfall, the optimum number of stations required is

    1. 5 nos
    2. 6 nos
    3. 10 nos
    4. 11 nos
    Show answer

    Answer: (4) 11 nos

    Coefficient of variation C_v = 100 × 30.7/92.8 = 33.08%. Optimum number of stations N = (C_v/ε)² = (33.08/10)² = 10.9, which is rounded up to 11 stations.

  2. Manager 2015 Paper 2 (Civil) · Q51 · Water Resources & Irrigation · Hydrology

    The area between the two isohyets 45cm and 55cm is 100km² and that between 55cm and 65cm is 150km². What is the average depth of annual precipitation over the basin of 250km²

    1. 50cm
    2. 52cm
    3. 56cm
    4. 60cm
    Show answer

    Answer: (3) 56cm

    By the isohyetal method each strip takes the mean of its bounding isohyets (50 cm and 60 cm), so P = (100 × 50 + 150 × 60)/250 = 14000/250 = 56 cm.

  3. Manager 2015 Paper 2 (Civil) · Q52 · Water Resources & Irrigation · Hydrology

    The total observed runoff volume during a 4hr storm with a uniform intensity of 2.8cm/hr is 25.2×10⁶ m³ from a basin of 280 km² area. What is the average infiltration rate for the basin

    1. 3.6mm/hr
    2. 4.8mm/hr
    3. 5.2mm/hr
    4. 5.5mm/hr
    Show answer

    Answer: (4) 5.5mm/hr

    Rainfall = 2.8 × 4 = 11.2 cm; runoff depth = 25.2×10⁶ / (280×10⁶) = 0.09 m = 9 cm; so infiltration = 11.2 − 9 = 2.2 cm in 4 h = 0.55 cm/h = 5.5 mm/hr.

  4. Manager 2015 Paper 2 (Civil) · Q53 · Water Resources & Irrigation · Hydrology

    A volume of 3×10⁶ m³ of groundwater was pumped out from an unconfined aquifer, uniformly over an area of 5km². The pumping lowered the water table from initial level of 102m to 99m. The specific yield of the aquifer is

    1. 0.20
    2. 0.30
    3. 0.40
    4. 0.50
    Show answer

    Answer: (1) 0.20

    Specific yield = volume drained / (area × fall of water table) = 3×10⁶ / (5×10⁶ × 3) = 0.20.

  5. Manager 2015 Paper 2 (Civil) · Q54 · Water Resources & Irrigation · Hydrology

    A hyetograph is a plot of

    1. Cumulative rainfall Vs time
    2. Rainfall intensity Vs time
    3. Rainfall depth Vs duration
    4. Discharge Vs time
    Show answer

    Answer: (2) Rainfall intensity Vs time

    A hyetograph shows rainfall intensity against time (usually as a bar diagram); cumulative rainfall against time is a mass curve and discharge against time is a hydrograph.

  6. Manager 2015 Paper 2 (Civil) · Q55 · Water Resources & Irrigation · Hydrology

    The unit of intrinsic permeability is

    1. cm/day
    2. m/day
    3. Darcy/day
    4. cm²
    Show answer

    Answer: (4) cm²

    Intrinsic permeability k = Kμ/γ depends only on the pore geometry of the medium and has dimensions of L² (cm², or the darcy); cm/day and m/day are units of hydraulic conductivity, which also depends on the fluid.

  7. Manager 2015 Paper 2 (Civil) · Q56 · Water Resources & Irrigation · Hydrology

    If S_y = specific yield and S_r = specific retention then

    1. S_y + S_r = void ratio
    2. S_y + S_r = porosity
    3. S_y + S_r = 1.0
    4. S_y + S_r = permeability
    Show answer

    Answer: (2) S_y + S_r = porosity

    Of the total pore volume, the part that drains by gravity is the specific yield and the part held back against gravity is the specific retention, so S_y + S_r = porosity (n), not void ratio.

Irrigation Engineering

  1. Manager 2015 Paper 2 (Civil) · Q57 · Water Resources & Irrigation · Irrigation Engineering

    If duty (D) is 1428 hectare/cumec and base period (B) is 120 days for an irrigated crop, then delta (Δ) in metres is given by

    1. 102.8
    2. 0.73
    3. 1.38
    4. 0.01
    Show answer

    Answer: (2) 0.73

    Δ = 8.64B/D (Δ in m, B in days, D in ha/cumec) = 8.64 × 120/1428 = 0.726 ≈ 0.73 m.

  2. Manager 2015 Paper 2 (Civil) · Q58 · Water Resources & Irrigation · Irrigation Engineering

    Which one of the following equations represents the downstream profile of Ogee spillway with vertical upstream face? (X, Y) are the coordinates of the point on the downstream profile with origin at the crest of the spillway and H_d is the design head.

    1. Y/H_d = -0.5(X/H_d)^1.85
    2. Y/H_d = -0.5(X/H_d)^(1/185)
    3. Y/H_d = -2.0(X/H_d)
    4. Y/H_d = -2.0(X/H_d)^(1/185)
    Show answer

    Answer: (1) Y/H_d = -0.5(X/H_d)^1.85

    The WES standard profile for a vertical upstream face is X^1.85 = 2.0 H_d^0.85 Y, i.e. Y/H_d = 0.5(X/H_d)^1.85, with the minus sign because Y is measured downward from the crest.

  3. Manager 2015 Paper 2 (Civil) · Q59 · Water Resources & Irrigation · Irrigation Engineering

    For no tension to develop in the gravity dam the eccentricity 'e' of the resultant force should be

    1. Less than b/3
    2. Less than b/6
    3. Less than b/4
    4. Less than b/12
    Show answer

    Answer: (2) Less than b/6

    Base stress = (ΣV/b)(1 ± 6e/b), so the heel stays in compression only if e ≤ b/6, i.e. the resultant lies within the middle third of the base.

  4. Manager 2015 Paper 2 (Civil) · Q60 · Water Resources & Irrigation · Irrigation Engineering

    Lacey's equations can be used for the design of

    1. Unlined channels only
    2. Lined channels only
    3. Both lined and unlined channels
    4. Neither lined nor unlined channels
    Show answer

    Answer: (1) Unlined channels only

    Lacey's regime theory applies to unlined alluvial channels that adjust their own width, depth and slope to the silt load until they reach regime; lined channels have a fixed section and are designed with Manning's formula.

  5. Manager 2015 Paper 2 (Civil) · Q61 · Water Resources & Irrigation · Irrigation Engineering

    Syphon aqueduct is a cross drainage work provided to carry canal over a natural drain when

    1. Canal bed is well above the HFL of the natural drain
    2. Canal bed is at the same level as the bed of the natural drain
    3. Canal bed is below the HFL of the natural drain
    4. Canal bed is below bed of the natural drain
    Show answer

    Answer: (3) Canal bed is below the HFL of the natural drain

    When the drain's HFL rises above the canal bed, the drain water passes under the canal through barrels flowing under pressure (syphonic action), so the structure is a syphon aqueduct; if the canal bed is well above the HFL it is an ordinary aqueduct.