UPSC Civil Services (Main) 2026 · GS Paper III
UPSC Mains 2026 GS 3 · Q7: model answer
General Studies Paper III: Technology, Economic Development, Bio-diversity, Environment, Security and Disaster Management · Disaster Management.
Discuss how the contradiction between ‘rapid infrastructure development’ and ‘disaster-risk reduction’ in ecologically-sensitive areas of India can be managed, with suitable examples.
Syllabus: Disaster Management · Disaster management
Ecologically-sensitive areasDisaster risk reductionCarrying capacityResilient infrastructure
India's ecologically-sensitive areas, such as the young and fragile Himalaya, the Western Ghats, coasts and islands, need roads, tunnels, hydropower and tourism facilities for connectivity, defence and livelihoods. Poorly planned projects, however, cut slopes, block drains and crowd floodplains, turning natural hazards into disasters. The Sendai Framework (2015–30) and the India-led CDRI (2019) call for risk-informed development: the answer is to build differently, not to stop building.
1. The contradiction: lessons from recent disasters
- Kedarnath (2013): a cloudburst and glacial-lake outburst swept away settlements and roads built along the Mandakini river.
- Joshimath (January 2023): land subsidence cracked hundreds of houses in a town built on old landslide debris, with poor drainage, unregulated construction and nearby hydro and road works.
- Silkyara tunnel (November 2023): a collapse in a Char Dham road tunnel trapped 41 workers for 17 days.
- Sikkim (October 2023): the South Lhonak glacial lake burst and destroyed the Teesta-III dam at Chungthang.
- Wayanad (30 July 2024): landslides in the Western Ghats killed over 200 people in an area flagged as ecologically sensitive by the Gadgil panel (2011).
2. Why development raises risk
- Ignoring geology: roads and buildings on unstable slopes or old debris, and vertical slope cuts without retaining structures.
- Piecemeal clearances: large projects split into small parts escape a full Environmental Impact Assessment; the Char Dham road project was divided into segments under 100 km, and cumulative impacts of many dams on one river are rarely studied.
- Exceeding carrying capacity: unregulated hotels and traffic in hill towns load fragile slopes and drainage.
- Climate change: heavier rain, cloudbursts and glacier retreat raise hazards faster than designs assume.
3. Managing the contradiction
- Risk-informed planning: landslide and hazard zonation (GSI is the nodal agency), carrying-capacity studies for hill towns, and building bylaws that keep construction off floodplains and debris slopes.
- Better assessment: strategic and cumulative EIA for river basins and corridors, no splitting of projects, and expert monitoring, as the Supreme Court's high-powered committee did for Char Dham.
- Engineering for resilience: geotechnical surveys, slope stabilisation, scientific muck disposal, drainage, and escape passages and safety audits in tunnels.
- Nature-based solutions: forests, wetlands and mangroves (MISHTI, 2023) act as natural buffers; eco-sensitive zones protect critical slopes.
- Institutions and people: glacial-lake monitoring and early warning, local disaster plans under the DM (Amendment) Act, 2025, and community participation in project decisions.
| Sector | Main risk | DRR measure |
|---|---|---|
| Hill highways | Slope failure, muck in rivers | Geotechnical study, slope protection, muck disposal sites |
| Tunnels | Collapse, trapped workers | Geological mapping, escape tunnels, safety audits |
| Hydropower | Flash floods, glacial-lake bursts | Basin-wide study, lake monitoring, early warning |
| Hill towns and tourism | Subsidence, overcrowding | Carrying-capacity caps, drainage, building bylaws |
| Coasts | Cyclones, erosion | CRZ rules, mangroves, cyclone shelters |
Development and safety need not be rivals. Building resilience into every project, guided by Sendai's "Build Back Better" and the principle of risk-informed development, will let the Himalaya and the Western Ghats gain infrastructure without paying for it in lives.