Learn with Anil · TGPSC HMWSSB Manager (Engineering) PYQsPractise online →Subscribe ₹149

TGPSC HMWSSB Manager 2015 Paper 2 ECE · Question 5

Question 5 of the TSPSC Manager (Engineering), HMWSSB, 2015: Paper 2 (Electronics & Communication Engineering) (1 November 2015). Try it first, then open the answer and explanation.

  1. Manager 2015 Paper 2 (ECE) · Q5 · Network Theory · Transients & Laplace Analysis

    A transient current in a network is i(t) = 2e⁻ᵗ − e⁻⁵ᵗ, t ≥ 0. The pole-zero configuration of I(s) is

    1. poles : 1,5 zeros : 9
    2. poles : −1, −5 zeros : −9
    3. poles : 2, −1 zeros : −1, −5
    4. poles : 2, −1 zeros: 1, 5
    Show answer

    Answer: (2) poles : −1, −5 zeros : −9

    I(s) = 2/(s + 1) − 1/(s + 5) = (2s + 10 − s − 1)/((s + 1)(s + 5)) = (s + 9)/((s + 1)(s + 5)). So the poles are at s = −1 and −5 and the zero is at s = −9.

Answer it in the practice appMake a topic-wise quiz