
Photo: Paddy fields near Eluru, iMahesh, CC BY-SA 4.0
APPSC Group-I Mains 2025 · Paper IV
2025 Paper IV · Q14(a): model answer
Economy & Development of India and Andhra Pradesh · Infrastructure: roads, power, digital and cities. Held in May 2025 (Notification 12/2023).
Critically evaluate the role of the Smart Cities Mission in transforming urban infrastructure in India. Mention its objectives, implementation progress, key achievements and the major challenges faced.
Syllabus: Infrastructure: roads, power, digital and cities · Cities: smart cities, urban services, waste and disasters
Smart Cities MissionArea-based developmentICCCUrban governance
The Smart Cities Mission (SCM), launched on 25 June 2015 by the Ministry of Housing and Urban Affairs, aimed to develop 100 cities, chosen through a challenge (2016-18), with core infrastructure, a clean environment and a decent quality of life through 'smart solutions'. It was India's first attempt at competitive, technology-driven urban renewal.
1. Objectives and design
- Area-based development: retrofitting, redevelopment or greenfield development of a chosen part of each city as a model for the rest.
- Pan-city solutions: ICT-based services such as intelligent traffic management, e-governance and smart water and power metering.
- Institutional model: implementation through city-level Special Purpose Vehicles (SPVs) set up as companies.
- Funding: central assistance of ₹48,000 crore (about ₹100 crore per city per year for five years), matched by States and urban local bodies; convergence with AMRUT, PMAY and Swachh Bharat.
2. Implementation progress
- Projects: about 8,000 projects worth about ₹1.64 lakh crore were taken up; over 90% were completed by the mission's extended end-date of 31 March 2025 (MoHUA).
- Timeline: the original five-year schedule was extended several times, reflecting slow early implementation.
3. Key achievements
- Integrated Command and Control Centres (ICCCs) in all 100 cities, used for traffic, policing, disaster response and COVID-19 management.
- Visible infrastructure: smart roads, water SCADA systems, rooftop solar, revived public spaces and heritage areas.
- New capacity: cities gained experience in data-driven planning and project management.
- Mobility and safety: smart traffic signals, CCTV networks and public bicycle sharing in several cities improved urban mobility and policing.
4. Major challenges
- 'Islands of excellence': area-based development covered only a small part of each city.
- Governance: SPVs bypassed elected municipal bodies, diluting the spirit of the 74th Amendment.
- Finance and capacity: weak PPP interest, low own revenue and limited technical capacity of urban local bodies.
- Scope: flooding, affordable housing and public transport, which matter most to ordinary citizens, were largely outside the mission.
| Achievements | Shortcomings |
|---|---|
| ICCCs in all 100 cities | Only a small area of each city covered |
| Over 90% of projects completed | Deadline extended to March 2025 |
| Data-driven urban management | SPVs sidelined elected local bodies |
| Convergence with other missions | Flooding, housing and transport left out |
AP angle: AP's four smart cities, Visakhapatnam, Kakinada, Tirupati and Amaravati, gained ICCC-based civic services and urban-renewal projects.
The mission modernised urban management but did not transform whole cities; integrating ICCCs into municipal governance and using the Urban Challenge Fund (₹1 lakh crore, Budget 2025-26) for citizen-centred, climate-resilient planning should guide the next phase.
The other choice in Q14
Answer either one in the exam.
- Q14(b)Critically explain the development of Transport, Energy and ICT infrastructure in Andhra Pradesh. How do these sectors contribute to the state's economic growth and connectivity ?
10 marks · Infrastructure: roads, power, digital and cities · AP's infrastructure: transport, energy, ICT, airports and projects
Every model answer on these pages is free to read. The Tool Kit adds four PDF books for Mains Papers I–IV: every previous question sorted by syllabus, with practice questions. It is in the ₹149 All-in-One Pass, with every previous paper of every exam on the site, practice quizzes, timed tests, mock test series and study books.
₹149 · valid for 12 months from the day you pay, on every exam · pay by UPI, card or net banking