Discuss the significance of solar energy in India's renewable energy strategy. Highlight the major initiatives, achievements and challenges in the promotion of solar power.
Syllabus: Infrastructure: roads, power, digital and cities · Transport and energy infrastructure in India (incl. solar)
Solar energyPanchamritEnergy securityStorage and grid
With about 300 sunny days a year and a solar potential of about 748 GWp (NISE), solar power is the backbone of India's renewable-energy strategy and of its COP26 'Panchamrit' pledges: 500 GW of non-fossil capacity by 2030 and net zero by 2070. Solar serves three goals together: energy security, climate action and affordable, decentralised access to power.
1. Significance
- Energy security: cuts dependence on imported coal, oil and gas, and shields the economy from price shocks.
- Climate: decarbonises power in line with the updated NDC (2022), which targets about 50% of installed power capacity from non-fossil sources by 2030.
- Cheapest new power: record-low tariffs below ₹2.5 per unit make solar cheaper than new coal plants.
- Decentralised access: rooftop systems, solar pumps for farmers and mini-grids reach remote areas and create green jobs.
- Industrial opportunity: domestic manufacturing of modules and cells can make India a supplier to the world.
2. Major initiatives
- National Solar Mission (2010): its target was raised in 2015 to 100 GW by 2022.
- Solar Parks scheme (2014-15) and PM-KUSUM (2019) for solar pumps and solarisation of farm feeders.
- PM Surya Ghar: Muft Bijli Yojana (2024): rooftop solar for 1 crore households, with up to 300 free units a month.
- Domestic manufacturing: PLI for high-efficiency modules and the Approved List of Models and Manufacturers (ALMM).
- Grid and storage: Green Energy Corridors and viability gap funding for battery storage; the International Solar Alliance (2015), launched with France.
- 2010 National Solar Mission launched
- 2015 100 GW target for 2022; International Solar Alliance launched
- 2019 PM-KUSUM for farmers
- 2024 PM Surya Ghar rooftop scheme
- 2025 Solar capacity crosses 100 GW (January)
- 2026 About 162 GW installed (June, MNRE)
3. Achievements
- Capacity: solar capacity crossed 100 GW in January 2025 and reached about 162 GW by June 2026 (MNRE).
- NDC goal met early: non-fossil sources exceeded 50% of installed power capacity in June 2025, five years ahead of the target.
4. Challenges and responses
| Challenge | Response |
|---|---|
| Intermittency and the evening peak | Battery storage (viability gap funding), pumped storage |
| Transmission bottlenecks, curtailment | Green Energy Corridors, inter-State transmission expansion |
| Import dependence on China for polysilicon, wafers and cells | PLI, ALMM, customs duties on imports |
| Weak DISCOM finances, unsigned power-sale agreements | Distribution reforms (RDSS) |
| Land needs and panel waste | Rooftop and canal-top solar; panels covered by e-waste rules |
- Storage gap: solar generation peaks at midday while demand peaks in the evening, so storage decides how far solar can grow.
- Supply chain: module assembly has grown fast, but upstream polysilicon, wafers and cells still depend on imports.
AP angle: AP hosts the Kurnool Ultra Mega Solar Park (1,000 MW), the Ananthapuramu solar parks and the Pinnapuram pumped-storage project, under its Integrated Clean Energy Policy (2024).
Storage, grid expansion and a domestic supply chain can make solar the foundation of India's energy transition.
The other choice in Q13
Answer either one in the exam.
- Q13(a)Discuss the current state of transport infrastructure in India and its contribution to economic development. Highlight key challenges and suggest policy measures for improving its efficiency and reach.
10 marks · Infrastructure: roads, power, digital and cities · Transport and energy infrastructure in India (incl. solar)
Every model answer on these pages is free to read. The Tool Kit adds four PDF books for Mains Papers I–IV: every previous question sorted by syllabus, with practice questions. It is in the ₹149 All-in-One Pass, with every previous paper of every exam on the site, practice quizzes, timed tests, mock test series and study books.
₹149 · valid for 12 months from the day you pay, on every exam · pay by UPI, card or net banking