Learn with Anil · APPSC Group-I PYQsPractise online →Subscribe ₹149
Paddy fields near Eluru, Andhra Pradesh, at sunrise

Photo: Paddy fields near Eluru, iMahesh, CC BY-SA 4.0

APPSC Group-I Mains 2020 · Paper IV

2020 Paper IV · Q1(a): model answer

Economy & Development of India and Andhra Pradesh · India's big economic problems. Held in December 2020 (Notification 27/2018).

Q1(a)10 marks2020 · Paper IV

State some of the notable initiatives taken by the government recently to boost the growth of manufacturing sector in India.

Syllabus: India's big economic problems · Why farming and factories grow slowly (and what is being done)

Model answer · free

Make in IndiaPLI schemesEase of doing businessIndustrial corridors

Manufacturing's share in India's GVA has stayed at roughly 15–17% for three decades, well below the 25% target of the National Manufacturing Policy, 2011. A weak factory sector means too few jobs for workers leaving farms and a large import bill for electronics and machinery. Since Make in India (September 2014), the government has combined a better investment climate, output-linked incentives and logistics reform to make India a manufacturing hub linked to global value chains.

1. Improving the investment climate

  • Make in India (2014): a campaign covering 25 focus sectors; FDI was liberalised, with the automatic route allowed up to 100% in most sectors and up to 74% in defence (2020).
  • Corporate tax cut (2019): the rate fell to 22% for existing companies and 15% for new manufacturing units set up by March 2024, bringing India in line with competing Asian economies.
  • Regulatory reform: the National Single Window System (2021) for approvals, the Jan Vishwas Act, 2023 (minor offences decriminalised), and the four Labour Codes, in force from 21 November 2025, which replace 29 central labour laws.
  • Competitive federalism: State rankings under the Business Reform Action Plan push States to compete for investors.

2. Incentives for scale and technology

  • Production Linked Incentive (PLI) schemes: 14 sectors with an outlay of ₹1.97 lakh crore, including mobiles, pharma, auto, batteries, solar modules, textiles and food. Because support is tied to actual sales, firms are rewarded only when they produce more in India.
  • Semiconductors and electronics: the India Semiconductor Mission (₹76,000 crore, 2021) for fabs and assembly-testing units, and the Electronics Component Manufacturing Scheme (2025) to deepen the supply chain.
  • National Manufacturing Mission (Union Budget 2025-26): policy support and a roadmap for small, medium and large industry.
  • PM MITRA parks (2021): seven integrated textile parks to give the textile chain scale from fibre to fashion.
Government fixes a base year and sector targets
Firm invests and raises output above the base
Incentive paid on incremental sales
Scale lowers costs; exports and jobs grow
How a PLI scheme works

3. Infrastructure and logistics

  • PM Gati Shakti (2021): a GIS-based master plan that coordinates roads, railways, ports and gas lines; the National Logistics Policy (2022) aims to cut logistics costs.
  • Dedicated Freight Corridors move cargo faster between the hinterland and ports.
  • Industrial smart cities: 12 new ones under the National Industrial Corridor Programme (August 2024), with ready plots.

4. Andhra Pradesh angle

  • Two of these 12 nodes, Orvakal (Kurnool) and Kopparthy (YSR Kadapa), are in AP.
  • The electronics cluster at Sri City, Kia's plant at Penukonda and the State's Industrial Development Policy 4.0 (2024-29) complement the national effort.

The results are visible: smartphones are now among India's largest exports. Raising manufacturing's share further, for Viksit Bharat@2047, needs better skills, more R&D, lower logistics costs and MSMEs linked to global value chains.

The other choice in Q1

Answer either one in the exam.

  1. Q1(b)Highlight some of the major factors leading to low agricultural productivity in India.

    10 marks · India's big economic problems · Why farming and factories grow slowly (and what is being done)

Write better answers: the Answer Writing Tool Kit

Every model answer on these pages is free to read. The Tool Kit adds four PDF books for Mains Papers I–IV: every previous question sorted by syllabus, with practice questions. It is in the ₹149 All-in-One Pass, with every previous paper of every exam on the site, practice quizzes, timed tests, mock test series and study books.

₹149 · valid for 12 months from the day you pay, on every exam · pay by UPI, card or net banking

Get it for ₹149