Learn with Anil · UPSC Civil Services PYQsMains PYQs →Subscribe ₹149
INS Vikrant and INS Vikramaditya sailing with their carrier battle group

Photo: INS Vikrant and INS Vikramaditya, Indian Navy, GODL-India

UPSC Civil Services (Main) 2025 · GS Paper III

UPSC Mains 2025 GS 3 · Q5: model answer

General Studies Paper III: Technology, Economic Development, Bio-diversity, Environment, Security and Disaster Management · Science and Technology.

Q510 marks150 words2025 · GS Paper III

The fusion energy programme in India has steadily evolved over the past few decades. Mention India’s contributions to the international fusion energy project – International Thermonuclear Experimental Reactor (ITER). What will be the implications of the success of this project for the future of global energy?

Syllabus: Science and Technology · Energy and nuclear technology

Model answer · free

Nuclear fusionITERTokamakClean baseload energy

Nuclear fusion joins light nuclei, deuterium and tritium, into helium and releases enormous energy, as in the Sun. It needs a plasma hotter than 100 million °C, held by powerful magnets in a doughnut-shaped tokamak. ITER, being built at Cadarache in France by seven partners, aims to produce ten times the heating power fed into its plasma. India joined ITER in 2005 and has built its own fusion programme alongside.

1. Evolution of India's fusion programme

  • Institutional base: plasma research that began at the Physical Research Laboratory, Ahmedabad, led to the Institute for Plasma Research (IPR), Gandhinagar (1986), now under the Department of Atomic Energy.
  • ADITYA (1989): India's first indigenous tokamak, later upgraded as ADITYA-U to study plasma behaviour and control.
  • SST-1: a steady-state superconducting tokamak (first plasma in 2013) that gave experience in superconducting magnets, cryogenics and long-pulse operation.
  • ITER-India: IPR hosts India's domestic agency for ITER, which has trained Indian industry to make large, precise fusion components.
  • Legal readiness: the draft rules under the SHANTI Act (August 2026) provide for a composite licence that also covers fusion reactors.
  1. 1986 Institute for Plasma Research set up
  2. 1989 ADITYA, India's first indigenous tokamak
  3. 2005 India joins ITER
  4. 2013 First plasma in SST-1
  5. 2020 L&T-built cryostat base installed at ITER
  6. 2026 Draft SHANTI Rules provide for licensing fusion reactors
India's fusion journey

2. India's contributions to ITER

  • Partnership: India is one of seven members (EU, China, India, Japan, South Korea, Russia and the USA). The EU, as host, bears about 45% of the cost and each other member about 9%, mostly in kind, as components made at home.
  • The cryostat: the world's largest stainless-steel vacuum chamber, about 29 m across and 29 m tall and weighing about 3,850 tonnes, fabricated by Larsen & Toubro in sections at Hazira (Gujarat) and assembled at the ITER site; it encloses the tokamak and its magnets.
  • Other systems: shielding, cooling, cryogenic, heating and diagnostic packages (table); Indian engineers at the site gain first-hand know-how.
PackageRole
CryostatOuter vacuum chamber around the tokamak and its magnets
In-wall shieldingBlocks inside the vacuum vessel that absorb neutrons
Cooling water systemRemoves heat from the machine
CryolinesCarry liquid helium to the superconducting magnets
Heating systemsIon-cyclotron power sources and electron-cyclotron gyrotrons
DiagnosticsDiagnostic neutral beam, power supplies, measurement systems
India's main in-kind contributions to ITER

3. Implications of ITER's success for global energy

  • Near-limitless fuel: deuterium comes from seawater and tritium can be bred from lithium; a few grams of fuel release as much energy as tonnes of coal.
  • Climate: no carbon dioxide is emitted during operation, and fusion would give steady baseload power to complement solar and wind on the way to net zero.
  • Safety and waste: no chain reaction, so no meltdown risk; no long-lived high-level waste, only activated materials; little proliferation risk.
  • Energy geopolitics: abundant fuel would reduce dependence on oil and gas exporters and chokepoints, a major gain for import-dependent India.
  • Realistic timeline: ITER is an experiment, not a power plant; research operations are planned for the mid-2030s and power-producing successors (DEMO) only around mid-century, so fusion cannot replace near-term renewables and fission.

By sharing in ITER for a small part of its cost, India has become a co-owner of fusion know-how. If ITER succeeds, fusion could be the ultimate clean energy of the second half of the century, while renewables and fission carry the nearer transition.

Every model answer here is free

The ₹149 All-in-One Pass opens the rest of the site for 12 months: UPSC Prelims GS Paper I and CSAT with explanations, practice quizzes and timed tests, UPSC CAPF and EPFO, the previous papers of every APPSC, TSPSC, police and SSC exam, every mock test series and the study books.

₹149 · valid for 12 months from the day you pay, on every exam · pay by UPI, card or net banking

Get it for ₹149