
Photo: Konark Sun Temple wheel, Joydeep, CC BY-SA 4.0
UPSC Civil Services (Main) 2020 · GS Paper I
UPSC Mains 2020 GS 1 · Q14: model answer
General Studies Paper I: Indian Heritage and Culture, History and Geography of the World and Society · Human and Economic Geography.
The interlinking of rivers can provide viable solutions to the multi-dimensional inter-related problems of droughts, floods and interrupted navigation. Critically examine.
Syllabus: Human and Economic Geography · Natural resources and minerals
Interlinking of riversNational Perspective PlanInter-basin transferEcological costs
India's water is unevenly spread in space and time: Himalayan rivers such as the Brahmaputra and Ganga carry huge monsoon surpluses, while much of peninsular and western India faces recurrent drought. The National Perspective Plan (1980) proposed the inter-basin transfer of surplus water to deficit basins, and the National Water Development Agency has identified 30 links (16 peninsular, 14 Himalayan). As of August 2026, only the Ken–Betwa link was under implementation.
1. The promise: a multi-purpose solution
- Drought: the Ken–Betwa link (₹44,605 crore) is to irrigate about 11.88 lakh ha and supply drinking water to about 62 lakh people in drought-prone Bundelkhand, besides 103 MW of hydropower and 27 MW of solar power.
- Floods: storing and diverting the monsoon peaks of the Kosi, Gandak and Ghaghra could ease floods in Bihar and eastern Uttar Pradesh.
- Navigation: link canals could extend inland waterways and connect with National Waterway-1 on the Ganga.
- Other gains: hydropower, urban water supply, groundwater recharge and more food; the Supreme Court (2012) directed time-bound implementation through a special committee.
2. Progress so far
- Ken–Betwa: the foundation stone was laid in December 2024; the Daudhan dam on the Ken will transfer water to the Betwa basin.
- Parbati–Kalisindh–Chambal (modified), integrated with the Eastern Rajasthan Canal Project: Madhya Pradesh and Rajasthan have signed an agreement for implementation.
- Setbacks: the Par–Tapi–Narmada and Damanganga–Pinjal links have completed DPRs but were removed from the priority list, and the inter-State Kosi–Mechi link was dropped because of its international dimension.
- Smaller links: Gujarat's SAUNI scheme and Andhra Pradesh's Godavari–Krishna link through the Polavaram canal apply the idea at a smaller scale.
3. Critical examination: limits and costs
- Ecology: the Ken–Betwa reservoir will submerge part of the Panna Tiger Reserve; lower flows to deltas raise salinity and threaten mangroves and fisheries.
- Hydrology: basins classed as surplus may have little to spare in the lean season, and climate change makes monsoon flows less predictable; Himalayan flood peaks are so large that canals can divert only a small fraction.
- Navigation: seasonal flows, siltation and gradients that need locks limit the viability of canal waterways.
- Society and federalism: links displace tribal and rural communities; water is a State subject (Entry 17, List II), so riparian States must agree; Himalayan links involve Nepal, Bhutan and Bangladesh.
- Cost and time: huge capital costs and long gestation risk stranded investment.
| Problem | Expected benefit | Concern |
|---|---|---|
| Drought | Irrigation and drinking water (Ken–Betwa: 11.88 lakh ha; 62 lakh people) | Submergence in Panna Tiger Reserve; displacement |
| Floods | Diversion of Himalayan flood peaks | Canals carry only a fraction; storage needs neighbours' consent |
| Navigation | Link canals as waterways | Seasonal flow, silt, locks |
| Governance | A national water grid | State consent; neighbouring countries |
4. Way forward
- Link by link: proceed only after full studies of environmental flows, costs, benefits and rehabilitation.
- Complementary solutions: watershed development, rainwater harvesting, aquifer recharge (Atal Bhujal Yojana), micro-irrigation, crop diversification, floodplain zoning and flood forecasting.
Interlinking can be one tool, not a silver bullet: viable for selected, well-studied links, while India's droughts, floods and navigation needs call for integrated water-resources management.
The ₹149 All-in-One Pass opens the rest of the site for 12 months: UPSC Prelims GS Paper I and CSAT with explanations, practice quizzes and timed tests, UPSC CAPF and EPFO, the previous papers of every APPSC, TSPSC, police and SSC exam, every mock test series and the study books.
₹149 · valid for 12 months from the day you pay, on every exam · pay by UPI, card or net banking