If 8 men can do a piece of work in 14 days, the time taken by 12 men to do the same piece of work will be:
- 7.5 days
- 8 days
- 8.5 days
- 9.33 days
यदि 8 आदमी किसी काम को 14 दिन में कर सकते हैं, तो 12 आदमी उसी काम को करने में कितना समय लेंगे?
- 7.5 दिन
- 8 दिन
- 8.5 दिन
- 9.33 दिन
Show answer
Answer: (4) 9.33 days