
Photo: Paddy fields near Eluru, iMahesh, CC BY-SA 4.0
APPSC Group-I Mains 2023 · Paper IV
2023 Paper IV · Q12(b): model answer
Economy & Development of India and Andhra Pradesh · Infrastructure: roads, power, digital and cities. Held in June 2023 (Notification 28/2022).
Explain the policy framework for development of Civil Aviation in Andhra Pradesh. Discuss the development of Greenfield Airport projects in Andhra Pradesh.
Syllabus: Infrastructure: roads, power, digital and cities · AP's infrastructure: transport, energy, ICT, airports and projects
Civil aviation policyGreenfield airportsUDANBhogapuram
Civil aviation drives tourism, investment, cargo and regional connectivity. Left without a metropolitan hub after bifurcation, Andhra Pradesh has made airports a key development lever, working within the National Civil Aviation Policy 2016, the Greenfield Airports Policy 2008 and the UDAN regional connectivity scheme, with a State agency to build and run new airports.
1. Policy framework
- National: the National Civil Aviation Policy 2016; the Greenfield Airports Policy 2008, under which the Ministry of Civil Aviation gives site clearance and in-principle approval; UDAN (2016) with viability gap funding for regional routes; and Krishi UDAN (2020) for perishables.
- State nodal agency: the Andhra Pradesh Airports Development Corporation Ltd (APADCL) develops State-led airports.
- Private participation: larger projects are PPPs under the AP Infrastructure Development Enabling Act 2001, with the State providing land, road links and incentives.
- Wider ecosystem: the State promotes aero-cities, MRO, cargo and a drone ecosystem (Drone City at Orvakal).
- Existing airports: Visakhapatnam (a naval enclave), Vijayawada, Tirupati, Rajahmundry, Kadapa and Kurnool-Orvakal; Puttaparthi is private.
Shaded: districts (2011) with greenfield airports in operation; (new) = greenfield, (planned) = proposed
Schematic map of Andhra Pradesh (2011 census district outlines), not to scale; for study only.
2. Greenfield airport projects
- Orvakal (Kurnool): Uyyalawada Narasimha Reddy Airport, built by APADCL, began UDAN flights in 2021 and connects Rayalaseema to major cities.
- Bhogapuram (Vizianagaram): Alluri Sitarama Raju International Airport, built by GMR on a DBFOT basis (phase-1 cost about ₹4,592 crore), with a 3,800 m runway and capacity of 6 million passengers a year in phase 1, scalable to over 40 million. It was inaugurated on 1 August 2026 and began commercial operations on 17 August 2026.
- Planned (about $1 billion): Kuppam (about 1,500 acres), Dagadarthi in Nellore (about 1,380 acres; land acquisition under way), Srikakulam-Palasa, Tadepalligudem, Nagarjuna Sagar, Tuni-Annavaram, Ongole and an international airport for Amaravati.
| Airport | District | Model and status |
|---|---|---|
| Orvakal | Kurnool | APADCL; UDAN flights since 2021 |
| Bhogapuram | Vizianagaram | GMR, DBFOT; commercial operations from August 2026 |
| Kuppam | Chittoor | Planned, about 1,500 acres |
| Dagadarthi | Nellore | Planned; land acquisition under way |
3. Challenges
- Land: acquisition delays and rehabilitation of displaced families.
- Viability: several UDAN routes have lapsed once subsidies ended, and small airports struggle for steady traffic.
- Links: airline capacity and city links, such as road and rail from Bhogapuram to Visakhapatnam, decide actual use.
- Balance: new airports at Orvakal and Kuppam bring air links to Rayalaseema, while Bhogapuram serves north coastal Andhra; each needs steady demand from industry and tourism.
With demand-led phasing, cargo and MRO hubs and multimodal links, AP's airports can turn its coastline and pilgrim centres like Tirupati into growth engines.
The other choice in Q12
Answer either one in the exam.
- Q12(a)Explain the 'PUSH' strategy of the Government of Andhra Pradesh with respect to Export Promotion Policy (2022 – 27). Discuss the challenges of export sector and the support extended by the AP Government towards export promotion in Andhra Pradesh.
10 marks · Industry and business (India and AP) · AP's industrial policy, incentives, corridors, MSMEs and exports
Every model answer on these pages is free to read. The Tool Kit adds four PDF books for Mains Papers I–IV: every previous question sorted by syllabus, with practice questions. It is in the ₹149 All-in-One Pass, with every previous paper of every exam on the site, practice quizzes, timed tests, mock test series and study books.
₹149 · valid for 12 months from the day you pay, on every exam · pay by UPI, card or net banking