What are the challenges faced by energy sector in Andhra Pradesh? Briefly give the vision targets for energy sector set by the AP Government.
Syllabus: Infrastructure: roads, power, digital and cities · AP's infrastructure: transport, energy, ICT, airports and projects
Power sector reformDISCOM financesRenewable energyIntegrated Clean Energy Policy 2024
Andhra Pradesh was a pioneer in power reform. The AP Electricity Reform Act, 1998 split the State Electricity Board into separate generation, transmission and distribution companies, and in 2014 AP was among the first States in the "24x7 Power for All" programme. Yet the sector still faces financial and technical stress, even as it moves towards a large renewable-energy future. Cheap, reliable power is central to the State's plans for industry, agriculture and green hydrogen.
1. Challenges
- Distribution company (DISCOM) finances: tariffs below the cost of supply and heavy reliance on State subsidy for free farm power, often paid late, have caused accumulated losses.
- High power purchase costs: costly long-term contracts, including early renewable energy contracts at high tariffs. The 2019 attempt to renegotiate them hurt investor confidence.
- True-up charges: fuel and power-purchase cost adjustments passed on to consumers after the fact, which causes public resentment.
- Integrating renewables: variable solar and wind supply, curtailment, and the need for storage and stronger transmission.
- Rising demand from cities, industry and farm pumps, and cyclone damage to the grid (Hudhud, 2014).
- Smart metering under the Revamped Distribution Sector Scheme, which some consumers oppose.
2. Vision targets
- As of 2020: 24x7 quality power for all, nine hours of free daytime power to farms, a 10,000 MW solar project for farm supply, lower losses, and energy efficiency through LED programmes.
- Current (Integrated Clean Energy Policy 2024, a five-year policy): over 160 GW of new renewable and pumped-storage capacity (78.5 GW solar, 35 GW wind, 22 GW pumped storage) plus 25 GWh of battery storage, and 1.5 million tonnes a year of green hydrogen, with about ₹10 lakh crore of investment and 7.5 lakh jobs.
- Consumers and costs: lower power purchase costs, rooftop solar under PM Surya Ghar, and NTPC's green hydrogen hub at Pudimadaka.
| Area | Target |
|---|---|
| Supply (2020) | 24x7 power; 9 hours of free daytime farm power |
| Solar for farms (2020) | 10,000 MW solar project |
| Renewables (ICE Policy 2024) | 78.5 GW solar, 35 GW wind |
| Storage (ICE Policy 2024) | 22 GW pumped storage, 25 GWh batteries |
| Green hydrogen (ICE Policy 2024) | 1.5 million tonnes a year |
| Investment and jobs | About ₹10 lakh crore; 7.5 lakh jobs |
3. Way forward
- DISCOM reform: timely subsidy payment, cost-reflective tariffs and lower losses.
- Competitive procurement: transparent bidding for new capacity and storage.
- Grid strength: green energy corridors and cyclone-resilient networks along the coast.
- Demand side: smart meters, time-of-day tariffs and energy efficiency to flatten the evening peak.
DISCOM reform, competitive procurement and storage-backed renewables can give AP affordable, reliable green power, in line with India's net-zero goal for 2070.
The other choice in Q14
Answer either one in the exam.
- Q14(b)Discuss about some of the major initiatives highlighted in Vision 2020 for the development of agriculture sector in India.
10 marks · Farming and allied sectors (India and AP) · Farm markets, prices and farm policy (MSP, APMC, e-NAM)
Every model answer on these pages is free to read. The Tool Kit adds four PDF books for Mains Papers I–IV: every previous question sorted by syllabus, with practice questions. It is in the ₹149 All-in-One Pass, with every previous paper of every exam on the site, practice quizzes, timed tests, mock test series and study books.
₹149 · valid for 12 months from the day you pay, on every exam · pay by UPI, card or net banking